Pettifer Construction
Summary
Snags are expensive! It is estimated that the average cost of a snag is £100. Obviously some are a lot less than this; but those that involve an element of demolition/rebuild can cost a whole lot more!
Testing Knowledge Online’s E-SAFE 100 snagging module at a major Pettifer Construction build, it has been estimated that a 1% margin improvement could be delivered says Chris Collison, Pettifer’s Operations Director.
Read more
Morris and Spottiswood
Summary
Being able to leave the site with a full report, including photos and clear allocated actions for the contractors and site management teams saves a significant portion of time. This allows staff to concentrate on the next job rather than worry about distributing and confirming actions. E-SAFE 100® can do all of this.
Does this sound familiar?
- 100+ Construction Sites
- 6 Safety Advisors
- 50+ Audits Each Month
- 300 Issues Raised every Month
- 1000+ Contractors
And all of this was managed with a paper based system!
Read more